air conditioning heat pumps ventilation air curtains solar installation-maintenance
     
 
Preinstall-Works air conditioning 
(split - multi -vrf)
 
Offer no extra charge for maintenance - service, installation of air conditioners, refrigeration, air conditioners installing air condition, air conditioning in: Glyfada, Vari, Varkiza, Voula, Vouliagmeni, Kavouri, Koropi, Athens, Nikaia, Koridallos, Peristeri, Peraeus, Drapetsona, Alimos , Argiroupoli, Ilioupoli, Nea Smyrni, Faliro, Markopoulo, Spata, Paiania, Glyka nera, Anthousa,  Aapropyrgos, Penteli, Kifissia, Dionysos, Eritrea, Nea Ionia, Halandri, Galatsi, Cholargos, Egaleo, Haidari, Agia Paraskevi, Papagos, Kaisariani , Imittos, Ilisia, Agios Dimitrios, Dafni, Filothei, Heraklion, Pefki, Peristeri, keratsini, Moshato, Kallithea, DaPhne, Elliniko, Vrillisia Mellisia, Kalyvia, Anavysso, Lagonisi, Saronida, Loytsa Artemida, Porto Rafti, Rafina, South Suburbs, Eastern Suburbs, Northern Suburbs, Western Suburbs and all surrounding areas above.
 
See video installation of air conditioners in
 
View Photo Installation of air conditions
 
 
 
       

 

   
 
 

We undertake systems and preinstallation air conditioning and ventilation systems in buildings and constructions

Work preinstallation air conditioning pipe made ??in buildings and construction, are as follows:

 
           
 
  • The piping and wiring are integrated, from the inner to the outdoor unit, and there will be no compounds, as well as drains.
  • The piping is reinforced type, suitable for FREON R410, R407 (green).
  • The cables used with a cross section in each case, 7×1,5 or 7×2,5 mm even 5x1,5 blentaz (shielded cables for digital low voltage) and are flexible. In this way we ensure trouble free installation of any future type air conditioner machine or company.
  • Wastewater (heliflex) is φ16mm or φ20mm, depending on the size of the air conditioner to be installed in the future.
  • In digging become the bricks removed 2 ''eyes'' so that ''package'' piping is within the bricks.
  • The tubes ''run'' on the floor is not covered with cement, but with metal type Ω channels, measuring 7 & 15cm and Height them not exceeding 3 cm. In this way we avoid possible injury or bend copper tubes, cables and drains.
  • The copper is ''washed'' and pressured with nitrogen at the end of work.
  • We are told, just before placing the flooring or tiles, etc. and request us to recheck the pressure of nitrogen in the copper and the entire system and where there is a loss, to restore the damage.
  • We also have a requirement for any damages will be the synergy from our other teams, at least!, You know.
           
   
  The work mentioned above is standard for the future.

Any changes will be made by customer's requirement and with the condition that they will not affect the installation.


We are always at your disposal for any clarification.


Sotiris Karkas
Mechanical Refrigeration

 
         
 
Back to menu
 
We undertake installations of air conditioners split, central and central systems, VRF
 
 
Contact us for more detail
 
 
 
    Photos    
 
Back to menu
 
 
 
 
 
 
 
 
 
 
 
 
             


 

 

 
 

Have questions?

Want information about a specific product?

Click here

 
 

Phone/Fax: 0030 210 96 55 040

Mobile: 0030 6944 36 04 59

 

 

 

 

Sale and installation
We supply products and installing them throughout Europe
Contact us
Transport and accommodation paid by the customer